General

Soon, freight trains to run at 100 Kmph as Railways plans to build high speed corridors

NewsGram Desk

By Newsgram Staff Writer

The Ministry of Railways has sanctioned implementation of Eastern Dedicated Freight Corridor (EDFC) and Western Dedicated Freight Corridor (WDFC) with freight train speeds of maximum 100 Kmph.

According to Railways Minsitry, "Alignment for both WDFC & EDFC has been finalized. WDFC starts from Jawaharlal Nehru Port Trust (JNPT), Mumbai and passes through the States of Maharashtra, Gujarat, Rajasthan, Haryana, and terminate at Dadri in Uttar Pradesh. The total length of the Western DFC will be about 1500 Kms."

"The Eastern Freight Corridor, starts from Sahnewal near Ludhiana in Punjab and passes through the States of Haryana, Uttar Pradesh, Bihar, Jharkhand and terminate at Dankuni in West Bengal, total length being 1856 Kms," the railways ministry said.

Excluding Sonnagar –Dankuni Section of EDFC, WDFC and EDFC is targeted to be completed in December 2019. Project implementation schedule, timelines have been drawn up and are being monitored on regular basis, railways said.

Ranking technologies for managing indoor pathogen transmission

A journey back in time to discover the exceptional geological heritage of the Pyrenees

Longer-lasting and more sustainable green hydrogen production

Eco-friendly nanobiolubricants set to transform industrial grinding practices

New book explores minority languages in the digital age