General

BHEL bags Rs 560 cr order from NTPC

Author : NewsGram Desk
  • BHEL bags Rs. 560 crore order
  • The order was bagged from NTPC
  • The order is about the FGD systems installation

Bharat Heavy Electricals on Wednesday said it has bagged an order worth Rs 560 crore from NTPC for setting up a system for emission control.

BHEL has secured the order for "supply and installation of the flue gas desulphurisation (FGD) system from NTPC for 2×490 MW National Capital Power Station at Dadri in Uttar Pradesh", the company said in a regulatory filing to the BSE.

Previously, BHEL installed the FGD system at Tata Power's Trombay Unit 8 in 2008, and is currently installing FGD systems at NTPC's 3×250 MW Bongaigaon project, it said. IANS

Subscribe to our channels on YouTube and WhatsApp

Download our app on Play Store

Sanders Explains How the New Democratic Congress Can Take an ‘Immediate First Step to Medicare for All’

Yes, the COP climate talks are far from perfect. But they still hold the power for change

Eight years on, Sandpapergate returns to haunt Australian Cricket: The entire cheating scandal explained amid Usman Khawaja and David Warner’s explosive revelations

How Ruby Myers, aka Sulochana, an Indian Jewish actress of Baghdadi descent, became ‘sapno ki rani’ during Indian cinema’s silent era

Pakistani TV anchor Rabia Ahsan shot dead at her Rawalpindi residence, husband reportedly confesses to murder